Working with the existing layout, the spaces were overhauled with new ceilings, floors finishes and feature graphic walls. This created the backdrop for the installation of bespoke joinery items and high-spec furniture and lighting.
The work was specifically scheduled to enable staff to book meeting rooms at certain times throughout the programme of works.